≥ 150 kW0 stations
Ultra-rapid charging in 10th of Ramadan
Sites in 10th of Ramadan with at least one 150 kW socket — the fastest stops in town.
No ultra-rapid indexed in 10th of Ramadan yet. See all charging in 10th of Ramadan.
Sites in 10th of Ramadan with at least one 150 kW socket — the fastest stops in town.