≥ 150 kW0 stations
Ultra-rapid charging in GRONG
Sites in GRONG with at least one 150 kW socket — the fastest stops in town.
No ultra-rapid indexed in GRONG yet. See all charging in GRONG.
Sites in GRONG with at least one 150 kW socket — the fastest stops in town.