chargevu
0 of 2 available3.7 kW peakChargePoint

222 GLENWOOD STATION #1

222 Glenwood Ave, Raleigh, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
222 Glenwood Ave, 27603, Raleigh, NC, United States
Access
24 hours daily
Coordinates
35.78353, -78.64717
Last verified
2025-11-11

About this stop

The 222 Glenwood Station #1 is a ChargePoint charging site in Raleigh. It offers 4 kW peak AC charging, which is slower than DC fast charging. This station is equipped with Type 1 (J1772) connectors. The reported status is operational.

Drivers looking for EV charging in Raleigh will find this station best suited for local top-ups or when time is not a critical factor. A 4 kW charging speed means a typical EV will gain about 10 to 16 miles of range per hour of charging. For context, fully charging a 60 kWh battery would take approximately 15 hours. This is not a rapid charging solution for long-distance travelers needing to add hundreds of miles quickly.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at 222 GLENWOOD STATION #1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of 222 GLENWOOD STATION #1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB