chargevu
0 of 2 available3.7 kW peakIndependent

Aecon Construction Group Inc

3 Phillip Pl, Kincardine, CA

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
3 Phillip Pl, N2Z 2Y8, Kincardine, ON, Canada
Coordinates
44.18193, -81.61999
Last verified
2025-11-11

About this stop

This station uses Type 1 (J1772) connectors, compatible with many older EVs and some newer models like the Chevrolet Bolt or Nissan Leaf. It is operated by Aecon Construction Group Inc and is an independent or unlisted network. The station is planned for future installation in Kincardine, CA. EV charging in Kincardine will eventually include this site.

The peak power is rated at 4 kW. This is slower AC charging, meaning it will add about 12 to 18 miles of range per hour of charging. This rate is best suited for local top-ups or for drivers who have ample time to wait. Expect this charger to be useful for drivers needing a charge while parked for extended periods, rather than a quick road trip stop.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Aecon Construction Group Inc.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Aecon Construction Group Inc.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB