Allego - Clermont-Ferrand Jaude
18 Rue D'Allagnat , Centre Jaude, Clermont-Ferrand, FR
8 ports
Ports at this station
- Available
CCS2
4× · up to 150 kW
- Available
Type 2
4× · up to 22 kW
Station info
- Address
- 18 Rue D'Allagnat , Centre Jaude, 63000, Clermont-Ferrand, France
- Total points
- 8
- Coordinates
- 45.77451, 3.08305
- Last verified
- 2025-11-09
About this stop
Allego operates an ultra-rapid EV charging station at Clermont-Ferrand Jaude in France. This site has 8 charging points with a peak power output of 150 kW. Connectors available are CCS (Type 2) and Type 2 (Socket Only). The station is currently operational.
With 150 kW peak power, this station can add about 100 miles of range to an EV in roughly 15-20 minutes, depending on the vehicle. It serves as a convenient stop for EV charging in Clermont-Ferrand, whether you need a quick top-up or are passing through. The multiple connectors cater to a wide range of electric vehicles currently on the market.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Allego - Clermont-Ferrand Jaude.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB