chargevu
4 of 4 available11 kW peakIndependent

An der Germania Brauerei 5

An der Germania Brauerei 5, Münster, DE

4 ports

Ports at this station

  • Type 2

    1× · up to 11 kW

    Available
  • Type 2

    1× · up to 11 kW

    Available
  • Type 2

    1× · up to 11 kW

    Available
  • Type 2

    1× · up to 11 kW

    Available

Station info

Address
An der Germania Brauerei 5, 48159, Münster, Germany
Coordinates
51.97710, 7.61145
Last verified
2021-07-09

About this stop

This station at An der Germania Brauerei 5 in Münster offers Type 2 connectors for EV charging. It operates on AC power, reaching a peak of 11 kW. The operator is independent or unlisted. This station is part of the EV charging infrastructure in Münster.

An 11 kW peak charging rate means you'll add about 30-40 miles of range per hour of charging, depending on your car. This makes it suitable for longer stops or overnight charging, rather than a quick top-up on a long journey. While the exact number of charging points is not specified, the station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at An der Germania Brauerei 5.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of An der Germania Brauerei 5.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB