Arendal VGS avd. Barbu - Agder fylkeskommune
Mølleheia 12, ARENDAL, NO
6 ports
Ports at this station
- Unknown
Type 2
1× · up to 11 kW
- Unknown
Type 2
1× · up to 11 kW
- Unknown
Type 2
1× · up to 11 kW
- Unknown
Type 2
1× · up to 11 kW
- Unknown
Type 2
1× · up to 11 kW
- Unknown
Type 2
1× · up to 11 kW
Station info
- Address
- Mølleheia 12, 4841, ARENDAL, Agder, Norway
- Total points
- 6
- Coordinates
- 58.46283, 8.77063
- Last verified
- 2023-02-13
About this stop
This charging station has six Type 2 socket-only connectors, compatible with most EVs sold in Europe. It is run by Agder fylkeskommune, listed as independent or unlisted on networks. The station offers 11 kW peak AC charging.
EV charging in Arendal is varied. An 11 kW peak rate means a full charge might take between 4 and 8 hours, depending on your car's battery size and onboard charger. This makes it a better choice for local top-ups than a quick road trip stop. The reported status of the chargers is unknown.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Arendal VGS avd. Barbu - Agder fylkeskommune.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB