chargevu
1 of 1 available22 kW peakIndependent

Ayunt. Martiherrero

Martiherrero, Martiherrero, ES

1 port · 2,5€/1.5hours

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Martiherrero, 05192, Martiherrero, Castile and León, Spain
Total points
1
Coordinates
40.67383, -4.77857
Last verified
2024-04-11

About this stop

This is the sole EV charging station in Martiherrero, operated independently. It offers 22 kW peak AC charging through a single Type 2 socket, suitable for drivers needing a slower, AC top-up. The reported status is operational.

At 22 kW peak, expect to add roughly 50 to 60 miles of range per hour, depending on your vehicle. This speed makes it a good option for topping up while you're in town or for a longer stop rather than a quick charge. The cost is 2,5€ for 1.5 hours of charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Ayunt. Martiherrero.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Ayunt. Martiherrero.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB