Ayunt. Massalaves. Cementerio
Cementerio, Massalaves, ES
3 ports
Ports at this station
- Available
CCS2
1× · up to 50 kW
- Available
Type 2 (tethered)
1× · up to 22 kW
- Available
CHAdeMO
1× · up to 50 kW
Station info
- Address
- Cementerio, Massalaves, Spain
- Total points
- 1
- Coordinates
- 39.14901, -0.52422
- Last verified
- 2025-10-20
About this stop
This planned rapid charger offers 50 kW peak power, suitable for drivers needing a quick charge. It has one charging point with CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. EV charging in Massalaves will see this independent or unlisted station added in the future. A 50 kW peak means you can add approximately 100 miles of range to a compatible EV in about an hour, depending on the vehicle. This station is likely best for topping up while in the area or for drivers who can plan their stops ahead of time. Its future availability means it's not yet a reliable option for immediate road trip needs.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Ayunt. Massalaves. Cementerio.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB