chargevu
0 of 2 available50 kW peakBC Hydro

BC Hydro - Chilliwack - District 1881 Parking

46037 Princess Ave, Chilliwack, CA

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
46037 Princess Ave, V2P 2A3, Chilliwack, BC, Canada
Access
24 hours daily
Coordinates
49.17023, -121.95118
Last verified
2025-11-11

About this stop

This BC Hydro station offers 50 kW rapid charging suitable for drivers needing a quick power boost. Located in Chilliwack, CA, it provides EV charging in Chilliwack with both CCS (Type 1) and CHAdeMO connectors available. The number of charging points is not specified.

A 50 kW peak charging speed means adding roughly 20 to 25 miles of range per hour of charging, depending on your vehicle. This makes the District 1881 Parking station a practical stop for topping up your battery, rather than a full road trip charge. The station is currently reported as operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BC Hydro - Chilliwack - District 1881 Parking.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BC Hydro - Chilliwack - District 1881 Parking.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB