Be Charge Scuola Primaria Porta Agnesi
Via Quadronno 29, Milano, IT
3 ports
Ports at this station
- Unknown
CCS2
1× · up to 75 kW
- Unknown
CHAdeMO
1× · up to 63 kW
- Unknown
Type 2 (tethered)
1× · up to 22 kW
Station info
- Address
- Via Quadronno 29, Milano, MI, Italy
- Total points
- 2
- Coordinates
- 45.45422, 9.19489
- Last verified
- 2022-06-10
About this stop
This Be Charge station offers 75 kW peak charging, suitable for drivers needing a quick power boost. Located in Milano, it has 2 charging points. Connectors available include CCS (Type 2), CHAdeMO, and a tethered Type 2. The station is currently operational.
At 75 kW peak, this station is a good stop for EV charging in Milano when you need to add about 100 miles of range in 30 minutes, depending on your vehicle. It functions best as a rapid top-up stop rather than a long-term destination charge.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Be Charge Scuola Primaria Porta Agnesi.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB