chargevu
0 of 2 available50 kW peakChargePoint

BLUE ENERGY 1 BEACON PARK DC2

1971 Grand River Ave, Detroit, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
1971 Grand River Ave, 48226, Detroit, MI, United States
Access
24 hours daily
Coordinates
42.33476, -83.05602
Last verified
2025-11-11

About this stop

For drivers needing a rapid charge, BLUE ENERGY 1 BEACON PARK DC2 offers 50 kW peak power. This ChargePoint station in Detroit provides CCS (Type 1) and CHAdeMO connectors. It is operational.

At 50 kW peak, expect to add about 25 miles of range per 10 minutes of charging, depending on your vehicle. This makes it a practical stop for EV charging in Detroit when you need a significant range boost quickly. It is suited for drivers needing a fast top-up on the go, rather than an overnight charge. This station is part of the ChargePoint network.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BLUE ENERGY 1 BEACON PARK DC2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BLUE ENERGY 1 BEACON PARK DC2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB