chargevu
0 of 2 available50 kW peakCircuit Electrique

BRCC - Ville de Mont-Tremblant

455 rue de la Rivière, Mont-Tremblant, CA

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
455 rue de la Rivière, J8E 3K6, Mont-Tremblant, QC, Canada
Coordinates
46.11851, -74.60044
Last verified
2025-11-11

About this stop

The Circuit Electrique network operates the BRCC - Ville de Mont-Tremblant station. This rapid charging site offers 50 kW peak power and has CCS (Type 1) and CHAdeMO connectors. The number of charging points is not specified. The station is currently operational. Finding EV charging in Mont-Tremblant is possible at this location.

A 50 kW peak charging speed means you can add about 150 miles of range to a compatible EV in an hour. This rate is suitable for quick top-ups or for drivers on longer journeys needing to extend their range. It is faster than Level 2 charging but slower than the latest ultra-rapid chargers. The station is a practical stop for drivers needing to recharge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at BRCC - Ville de Mont-Tremblant.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of BRCC - Ville de Mont-Tremblant.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB