chargevu
0 of 3 available50 kW peakInCharge (US)

Bridgewater Volkswagen 2

15109 Highway Trunk 3, Hebbville, CA

3 ports

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown
  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
15109 Highway Trunk 3, B4V 6X4, Hebbville, NS, Canada
Access
For fleet use only
Coordinates
44.36033, -64.52768
Last verified
2025-11-11

About this stop

Bridgewater Volkswagen 2 in Hebbville, CA, provides 50 kW peak charging for drivers needing a quick power boost. This InCharge network station offers CCS (Type 1), CHAdeMO, and Type 1 (J1772) connectors. It is currently operational. Finding EV charging in Hebbville is made easier with this option.

At 50 kW, this rapid charger adds about 20 miles of range per 10 minutes of charging, depending on your vehicle. This makes it a useful stop for topping up during a longer journey or for drivers who need more power than a Level 2 charger can provide. It's not a destination for hours-long stays but for efficient battery replenishment.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Bridgewater Volkswagen 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Bridgewater Volkswagen 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB