chargevu
10 of 10 available150 kW peakBump (FR)

Bump - Centre Commercial Ginko - Bordeaux Lac

90 Av. des 40 Journaux , Bordeaux, FR

10 ports

Ports at this station

  • CCS2

    4× · up to 150 kW

    Available
  • Type 2

    6× · up to 22 kW

    Available

Station info

Address
90 Av. des 40 Journaux , 33300, Bordeaux, France
Total points
10
Coordinates
44.87948, -0.56828
Last verified
2025-11-25

About this stop

This Bump station at Centre Commercial Ginko in Bordeaux Lac offers 10 charging points. Six have CCS connectors for most modern EVs. Four offer Type 2 sockets for vehicles that carry their own cable. The network operator is Bump. These are ultra-rapid chargers capable of 150 kW peak power.

This station is a practical stop for EV charging in Bordeaux. 150 kW peak power can add about 100 miles of range in roughly 15 to 20 minutes for a compatible EV, depending on battery size and charge level. It is best suited for quick top-ups during shopping trips or as a rapid charge point for drivers passing through the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Bump - Centre Commercial Ginko - Bordeaux Lac.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Bump - Centre Commercial Ginko - Bordeaux Lac.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB