chargevu
2 of 2 available22 kW peakEnel X

Centro Commerciale Due Mari | EnelX

SP169/2, Località Comuni Condomini, Maida , IT

2 ports

Ports at this station

  • Type 2

    1× · up to 22 kW

    Available
  • SCAME Type 3A

    1× · up to 3.7 kW

    Available

Station info

Address
SP169/2, Località Comuni Condomini, 88025, Maida , CZ, Italy
Total points
2
Coordinates
38.90019, 16.34856
Last verified
2019-07-18

About this stop

Enel X operates two charging points at Centro Commerciale Due Mari in Maida, Italy. These chargers offer a peak power of 22 kW. The available connectors include SCAME Type 3A for low power and Type 2 sockets. The station is currently reported as operational.

This station provides slower AC charging, suitable for local top-ups rather than rapid road-trip refueling. A 22 kW peak rate means you can add about 13 miles of range per hour of charging, depending on your vehicle. If you need EV charging in Maida, this location offers a consistent power source for drivers. Plan accordingly for longer charging times compared to DC fast chargers.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Centro Commerciale Due Mari | EnelX.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Centro Commerciale Due Mari | EnelX.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB