chargevu
0 of 2 available3.7 kW peakChargePoint

COUNTY COMPLEX DEEDS #1

70 Railroad Ave, Barnstable, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
70 Railroad Ave, 02630, Barnstable, MA, United States
Access
24 hours daily
Coordinates
41.70062, -70.30595
Last verified
2025-11-11

About this stop

County Complex Deeds #1 is a ChargePoint station located in Barnstable, US. It provides Type 1 (J1772) connectors for electric vehicles. The station operates with a peak power output of 4 kW, which is a slower AC charging speed.

This station is best suited for local top-ups or shorter stops rather than long road trips. A 4 kW peak output means it will add about 12 to 16 miles of range per hour of charging, depending on your vehicle's efficiency. This rate is considerably slower than DC fast chargers, so plan accordingly for your EV charging in Barnstable needs. The reported status for this location is operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at COUNTY COMPLEX DEEDS #1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of COUNTY COMPLEX DEEDS #1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB