COUNTY COMPLEX DEEDS #1
70 Railroad Ave, Barnstable, US
2 ports
Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 3.7 kW
Station info
- Address
- 70 Railroad Ave, 02630, Barnstable, MA, United States
- Access
- 24 hours daily
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 41.70062, -70.30595
- Last verified
- 2025-11-11
About this stop
County Complex Deeds #1 is a ChargePoint station located in Barnstable, US. It provides Type 1 (J1772) connectors for electric vehicles. The station operates with a peak power output of 4 kW, which is a slower AC charging speed.
This station is best suited for local top-ups or shorter stops rather than long road trips. A 4 kW peak output means it will add about 12 to 16 miles of range per hour of charging, depending on your vehicle's efficiency. This rate is considerably slower than DC fast chargers, so plan accordingly for your EV charging in Barnstable needs. The reported status for this location is operational.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of COUNTY COMPLEX DEEDS #1.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB