DGDG CP250#2
43690 Auto Mall Cir, Fremont, US
2 ports
Ports at this station
- Unknown
CHAdeMO
1× · up to 50 kW
- Unknown
CCS1
1× · up to 50 kW
Station info
- Address
- 43690 Auto Mall Cir, 94538, Fremont, CA, United States
- Access
- Mon: 6:00am-9:00pm; Tue: 6:00am-9:00pm; Wed: 6:00am-9:00pm; Thu: 6:00am-9:00pm; Fri: 6:00am-9:00pm; Sat: 6:00am-9:00pm; Sun: 6:00am-9:00pm
- Phone
- 888-758-4389
- Website
- chargepoint.com
- Coordinates
- 37.49940, -121.97787
- Last verified
- 2025-11-11
About this stop
DGDG CP250#2 is a ChargePoint-operated station located in Fremont, US. This facility offers rapid charging with a peak output of 50 kW. It supports both CCS (Type 1) and CHAdeMO connectors, making it compatible with a range of electric vehicles.
This station is best suited for quick charging needs rather than extended stays. A 50 kW peak power output typically adds about 100 miles of range to an EV in one hour, depending on the vehicle's battery and charging rate. It's a practical option for EV charging in Fremont when you need to get back on the road quickly.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of DGDG CP250#2.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB