chargevu
0 of 1 available2.3 kW peakStadtwerke Clausthal-Zellerfeld

Dorpsplein 18

Dorpsplein 18, Reusel-De Mierden, NL

1 port · 0.00 gratis

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 2.3 kW

    Unknown

Station info

Address
Dorpsplein 18, 5094 GJ, Reusel-De Mierden, Netherlands
Total points
1
Coordinates
51.40648, 5.14885
Last verified
2016-06-04

About this stop

This Stadtwerke Clausthal-Zellerfeld station at Dorpsplein 18 in Reusel-De Mierden provides EV charging. It has one charging point with a CEE 7/4 Schuko Type F connector, compatible with many standard European electric vehicles. The station is currently operational. This offers EV charging in Reusel-De Mierden for drivers needing a local top-up.

With a 2 kW peak AC output, this station is best suited for overnight charging or for drivers who have ample time. To put 2 kW into perspective, fully charging a typical EV battery would take well over 24 hours. This charging speed means it is not ideal for quick road trip stops, but rather for convenient local use when parked for an extended period. The charging is free of charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Dorpsplein 18.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Dorpsplein 18.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB