chargevu
3 of 3 available2.3 kW peak(Business Owner at Location)

E-Bike Station Ettringen / Kirch-Siebnach

Kirch Siebnach 3, Ettringen, DE

3 ports

Ports at this station

  • Schuko (CEE 7/4)

    3× · up to 2.3 kW

    Available

Station info

Address
Kirch Siebnach 3, 86833, Ettringen, Landkreis Unterallgäu, Germany
Total points
3
Coordinates
48.14726, 10.66403
Last verified
2018-02-09

About this stop

E-Bike Station Ettringen / Kirch-Siebnach is located in Ettringen, Germany. This independent charging site has three operational charging points. Each point provides up to 2 kW of AC power and uses the CEE 7/4 Schuko Type F connector. EV charging in Ettringen at this location is managed by an independent operator.

A 2 kW peak charging rate is slow. Expect to add about 2 miles of range per hour of charging. This station is better suited for a local top-up than for a long road trip. Drivers will need to factor in extended charging times. The three points provide options for local EV owners needing a charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at E-Bike Station Ettringen / Kirch-Siebnach.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of E-Bike Station Ettringen / Kirch-Siebnach.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB