East End Building
715 E Main St, Midland, US
2 ports
Ports at this station
- Unknown
Type 1 (J1772)
2× · up to 3.7 kW
Station info
- Address
- 715 E Main St, 48674, Midland, MI, United States
- Access
- 24 hours daily
- Coordinates
- 43.61003, -84.23976
- Last verified
- 2025-11-11
About this stop
This independent EV charging station, East End Building, serves Midland, US. It offers Type 1 (J1772) connectors, which fit most older electric vehicles and many newer ones. The station operates on a slower AC power level, reaching a peak of 4 kW. This makes it a practical option for local EV charging needs rather than a quick charge on a long journey.
A 4 kW charging speed means you will add about 12 to 18 miles of range per hour of charging, depending on your vehicle's efficiency. Expect to add roughly 40 to 50 miles over a four-hour period. This station is best suited for drivers needing to top up while parked locally for an extended time, like at work or home if home charging isn't an option. It supports drivers in Midland looking for accessible charging points.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of East End Building.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB