chargevu
1 of 2 available150 kW peakPowerGo

EESS Arribide (PowerGo)

Polígono Industrial Arriandi, P-1, 108, Lurreta, Bizkaia, ES

2 ports

Ports at this station

  • CCS2

    1× · up to 150 kW

    Available
  • CCS2

    1× · up to 150 kW

    Unknown

Station info

Address
Polígono Industrial Arriandi, P-1, 108, 48215, Lurreta, Bizkaia, Spain
Coordinates
43.18285, -2.66132
Last verified
2026-04-08

About this stop

Drivers needing 150 kW peak charging will find EESS Arribide (PowerGo) in Lurreta, Bizkaia. This station, operated by PowerGo, offers ultra-rapid charging speeds. All charging points use CCS (Type 2) connectors and are reported as operational.

This stop is best suited for drivers on longer journeys needing a quick power boost. A 150 kW peak rate can add approximately 100 miles of range to a compatible EV in under 20 minutes, depending on the vehicle and battery state. This is a practical option for EV charging in Lurreta, Bizkaia.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at EESS Arribide (PowerGo).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of EESS Arribide (PowerGo).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB