chargevu
0 of 1 available3.7 kW peakChargePoint

ENTERPRISE ENTERPRISE 20B1

32805 Northwestern Highway, Farmington Hills, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
32805 Northwestern Highway, 48334, Farmington Hills, MI, United States
Access
24 hours daily
Coordinates
42.52637, -83.35541
Last verified
2025-11-11

About this stop

Enterprise Enterprise 20B1 is a ChargePoint charging site in Farmington Hills, US. It offers Level 2 AC charging with a peak power of 4 kW. The station is equipped with Type 1 (J1772) connectors. Its current status is reported as operational.

This station is best suited for local top-ups rather than quick road trip charging. A 4 kW peak output means it will add about 15 to 20 miles of range per hour of charging. This is slower than DC fast chargers, so plan accordingly for longer stays. It provides EV charging in Farmington Hills.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ENTERPRISE ENTERPRISE 20B1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ENTERPRISE ENTERPRISE 20B1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB