chargevu
2 of 2 available20 kW peakIndependent

ERCO - Complex Llanogrande

Km 8.5 Vía, Rionegro, Antioquia, Complex Llanogrande - Sotano, Rionegro, CO

2 ports · 1700

Ports at this station

  • CCS1

    1× · up to 20 kW

    Available
  • CCS2

    1× · up to 20 kW

    Available

Station info

Address
Km 8.5 Vía, Rionegro, Antioquia, Complex Llanogrande - Sotano, 054048, Rionegro, Antioquia, Colombia
Total points
2
Coordinates
6.12483, -75.42198
Last verified
2026-04-27

About this stop

This slower AC charging station, ERCO - Complex Llanogrande, is located in Rionegro, CO. It is run by an independent or unlisted operator. The station has two charging points, each capable of a 20 kW peak output. Connectors available are CCS (Type 1) and CCS (Type 2). The reported cost is 1700.

Expect a 20 kW peak output to add about 50 miles of range per hour for many EVs, making it best for local top-ups or a slower stop. This is one option for EV charging in Rionegro. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at ERCO - Complex Llanogrande.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of ERCO - Complex Llanogrande.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB