chargevu
0 of 2 available3.7 kW peakChargePoint

EVERGY @AM CENTRY-266D

4500 Main St @ American Century Employee Park, Kansas City, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
4500 Main St @ American Century Employee Park, 64111, Kansas City, MO, United States
Access
24 hours daily
Coordinates
39.04486, -94.58738
Last verified
2025-11-11

About this stop

This ChargePoint station, EVERGY @AM CENTRY-266D, is located in Kansas City, US. It offers Level 2 AC charging with a peak power of 4 kW. The station is equipped with Type 1 (J1772) connectors. Its current reported status is operational, contributing to EV charging in Kansas City.

A 4 kW peak power rate means charging will be slower than DC fast chargers. Expect to add about 10-15 miles of range per hour of charging, depending on your vehicle. This makes it more suitable for local top-ups or longer stops rather than quick road trip charging. Check the ChargePoint app for real-time availability and any specific network details.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at EVERGY @AM CENTRY-266D.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of EVERGY @AM CENTRY-266D.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB