chargevu
2 of 4 out of service180 kW peakPLN (Indonesia)

Farizon Arista Bandung

Farizon Arista Bandung, , Jl Soekarno-Hatta, Bandung, ID

4 ports · IDR 2467/kWh ++

Ports at this station

  • CCS2

    2× · up to 120 kW

    Operational
  • CCS2

    2× · up to 180 kW

    Out of service

Station info

Address
Farizon Arista Bandung, , Jl Soekarno-Hatta, 40236, Bandung, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.94722, 107.59616
Last verified
2026-05-29

How this site compares

In Bandung

Faster than 50 of the other 54 sites

23 of 55 sites with a known peak power reach 50 kW or more

In Indonesia

Top 12% by peak power

Among 2,149 sites with a known peak power

PLN (Indonesia)

1,614 sites across 503 cities in Indonesia

All PLN (Indonesia) sites in Indonesia →

50 kW+ within 25 km

26 other sites, 5 at 150 kW or more

Nearest: PLN UP3 Bandung · 1.7 km · 120 kW · PLN (Indonesia)

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Farizon Arista Bandung.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Farizon Arista Bandung.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB