chargevu
0 of 2 available50 kW peakChargePoint

FIRSTENERGY STATION 4

341 White Pond Drive, Akron, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
341 White Pond Drive, 44320, Akron, OH, United States
Access
24 hours daily
Coordinates
41.10363, -81.57955
Last verified
2025-06-24

About this stop

This ChargePoint-operated station in Akron, US, offers CCS (Type 1) and CHAdeMO connectors. These are compatible with most EVs sold in North America and Japan. The station is currently operational.

With a peak power of 50 kW, this is a rapid charging option for EV charging in Akron. Expect to add about 30 miles of range in an hour of charging, depending on your vehicle. This makes it a practical stop for drivers needing to add range during a longer trip or for a quick top-up. Plan your charging based on your vehicle's capabilities and your driving needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at FIRSTENERGY STATION 4.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of FIRSTENERGY STATION 4.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB