chargevu
0 of 1 available3.7 kW peakChargePoint

FRONT BUILDING FRONT BLDNG 1

4202 Stevens Creek Blvd, San Jose, US

1 port

Ports at this station

  • Type 1 (J1772)

    1× · up to 3.7 kW

    Unknown

Station info

Address
4202 Stevens Creek Blvd, 95129, San Jose, CA, United States
Access
24 hours daily
Coordinates
37.32270, -121.97615
Last verified
2025-06-24

About this stop

This ChargePoint station at FRONT BUILDING FRONT BLDNG 1 in San Jose offers 4 kW peak AC charging, best suited for drivers needing a local charge. The station provides Type 1 (J1772) connectors. The unstated number of charging points are reported as operational.

A 4 kW peak charging speed means you will add about 12-16 miles of range per hour. This is slower than DC fast charging. It is suitable for topping up your battery while parked for a few hours, such as during a workday or shopping trip. This is not a rapid charge stop for longer journeys. EV charging in San Jose includes options like this for everyday needs.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at FRONT BUILDING FRONT BLDNG 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of FRONT BUILDING FRONT BLDNG 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB