chargevu
0 of 2 available50 kW peakChargePoint

GARDNERVILLE VISITORS L3 ST1

1395 U.S. Hwy 395 N, Gardnerville, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
1395 U.S. Hwy 395 N, 89410, Gardnerville, NV, United States
Access
24 hours daily
Coordinates
38.93967, -119.74635
Last verified
2025-11-11

About this stop

ChargePoint operates the GARDNERVILLE VISITORS L3 ST1 in Gardnerville, US. This site offers rapid charging up to 50 kW. It provides connectors for both CCS (Type 1) and CHAdeMO. The current status is reported as operational, contributing to EV charging in Gardnerville.

A 50 kW peak output can add about 20-25 miles of range per 10-minute charge, depending on your vehicle's charging speed and battery temperature. This level of power is best suited for topping up during local errands or for drivers on longer journeys who need a substantial boost. It is not the fastest charging available but offers a good balance of speed and accessibility.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at GARDNERVILLE VISITORS L3 ST1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of GARDNERVILLE VISITORS L3 ST1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB