Gentari | Senawang South Bound Layby (BESS | 150kW DC)
Senewang Layby South Bound, KM250, North-South Expressway, Senawang, MY
4 ports · DC @ RM1.80/kWh
Ports at this station
- Available
CCS2
4× · up to 150 kW
Station info
- Address
- Senewang Layby South Bound, KM250, North-South Expressway, 71450, Senawang, Negeri Sembilan, Malaysia
- Total points
- 4
- Coordinates
- 2.64027, 101.99581
- Last verified
- 2026-02-10
About this stop
This ultra-rapid station suits drivers needing a fast charge on the go. Gentari | Senawang South Bound Layby (BESS | 150kW DC) is run by Gentari Go in Senawang, Malaysia. It offers 150 kW peak DC charging through four points equipped with CCS (Type 2) connectors. EV charging in Senawang can be quick here.
At 150 kW peak, you can add about 100 miles of range in roughly 10 to 15 minutes, depending on your car. This station functions as a road-trip ultra-rapid stop rather than a local top-up spot. It is currently operational. The cost is RM1.80 per kilowatt-hour for DC charging.
5 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Gentari | Senawang South Bound Layby (BESS | 150kW DC).
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB