GOC-TESTE-00001
R. Daciano Baptista Marques, 245, Vila Nova de Gaia, PT
3 ports
Ports at this station
- Broken
Type 2 (tethered)
1× · up to 22.2 kW
- Broken
Type 2 (tethered)
1× · up to 22.2 kW
- Broken
Type 2 (tethered)
1× · up to 2.8 kW
Station info
- Address
- R. Daciano Baptista Marques, 245, 4400-617, Vila Nova de Gaia, Portugal
- Coordinates
- 41.14281, -8.64009
- Last verified
- 2026-04-23
About this stop
This EVIO charging station is located in Vila Nova De Gaia, Portugal. It provides 22 kW peak AC charging through Type 2 tethered connectors. The number of charging points is not specified. EV charging in Vila Nova De Gaia is growing, and this station, when operational, will add to the available infrastructure.
At 22 kW peak, this station is best suited for topping up your battery while parked locally, rather than a quick charge during a long road trip. To put 22 kW into context, charging a typical EV from 20% to 80% might take around 3 to 4 hours. The reported status for this station is currently Not Operational, so drivers should confirm its working status before planning a visit.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of GOC-TESTE-00001.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB