chargevu
0 of 2 available50 kW peakChargePoint

GPM INVESTMENTS 5712 DC2

16350 Allenby Dr, Marysville, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
16350 Allenby Dr, 43040, Marysville, OH, United States
Access
24 hours daily
Coordinates
40.24071, -83.34145
Last verified
2025-11-11

About this stop

This ChargePoint station in Marysville offers CCS (Type 1) and CHAdeMO connectors for your EV. It provides 50 kW peak DC fast charging. EV charging in Marysville includes this operational site. The number of charging points is not specified.

A 50 kW peak power output means this station can add about 20 to 25 miles of range per 10 minutes of charging, depending on your vehicle. This makes it a good option for a quick top-up or a routine stop. It is not designed for long-distance road trips where higher power levels are generally preferred for faster charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at GPM INVESTMENTS 5712 DC2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of GPM INVESTMENTS 5712 DC2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB