chargevu
0 of 2 available3.7 kW peakChargePoint

GREENWEALTH LOS AMIGOS PRK

600 Hollister Ave, Santa Monica, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
600 Hollister Ave, 90405, Santa Monica, CA, United States
Access
24 hours daily
Coordinates
34.00688, -118.48161
Last verified
2025-11-11

About this stop

This ChargePoint station at Greenwealth Los Amigos Park offers 4 kW peak AC charging with Type 1 (J1772) connectors. It's best suited for drivers who need a slower AC charge. The station is operational.

At 4 kW peak, expect to add about 12 to 16 miles of range per hour of charging. This speed makes it ideal for local top-ups rather than quick road trip stops. If you're looking for EV charging in Santa Monica, this ChargePoint location provides a steady power source for residents and visitors.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at GREENWEALTH LOS AMIGOS PRK.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of GREENWEALTH LOS AMIGOS PRK.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB