chargevu
0 of 2 available3.7 kW peakChargePoint

GTI PROPERTIES STATION #1-LFT

324 albany st, Boston, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
324 albany st, 02118, Boston, MA, United States
Access
24 hours daily
Coordinates
42.34132, -71.06287
Last verified
2025-11-11

About this stop

GTI PROPERTIES STATION #1-LFT is an operational EV charging site in Boston, US. This ChargePoint station provides AC charging with a peak power of 4 kW. All charging points use the Type 1 (J1772) connector standard. Finding reliable EV charging in Boston can be a challenge, but this location is confirmed as active.

At 4 kW peak, this station is best suited for local top-ups rather than long-distance road trips. To put 4 kW in perspective, it adds about 12 to 16 miles of range per hour of charging. This means a full charge for a vehicle with a smaller battery might take several hours. Drivers should plan their charging stops accordingly, understanding this is a slower AC charging option.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at GTI PROPERTIES STATION #1-LFT.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of GTI PROPERTIES STATION #1-LFT.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB