chargevu
3 of 3 available2.3 kW peakInnogy SE (RWE eMobility)

Hallenbad

Stimbergstraße, Am Hünenplatz/ Ecke Stimbergstr., Oer-Erkenschwick, DE

3 ports

Ports at this station

  • Schuko (CEE 7/4)

    3× · up to 2.3 kW

    Available

Station info

Address
Stimbergstraße, Am Hünenplatz/ Ecke Stimbergstr., 45739, Oer-Erkenschwick, Kreis Recklinghausen, Germany
Total points
3
Coordinates
51.64291, 7.25796
Last verified
2015-08-28

About this stop

Drivers needing a slow AC charge in Oer-Erkenschwick will find the Hallenbad station useful. Operated by Innogy SE, it has three charging points equipped with CEE 7/4 (Schuko) connectors. The station delivers a peak power of 2 kW.

This is not a rapid charging stop. A 2 kW peak means adding about 6 to 8 miles of range per hour. Plan for this to be a local top-up rather than a quick boost for long-distance travel. EV charging in Oer-Erkenschwick includes this slower option for extended dwell times.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Hallenbad.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Hallenbad.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB