chargevu
10 of 10 available350 kW peakeVgo Network

Hollister Shopping Center

341 Tres Pinos Road, Hollister, US

10 ports

Ports at this station

  • CCS1

    2× · up to 350 kW

    Available
  • CCS1

    2× · up to 350 kW

    Available
  • CCS1

    2× · up to 350 kW

    Available
  • CCS1

    2× · up to 350 kW

    Available
  • CCS1

    2× · up to 350 kW

    Available

Station info

Address
341 Tres Pinos Road, 95023 , Hollister, CA, United States
Total points
1
Coordinates
36.83921, -121.39554
Last verified
2025-03-29

About this stop

This eVgo Network station offers 350 kW peak power, ideal for EV drivers needing a rapid charge. It has one charging point equipped with a CCS (Type 1) connector. This location is operational and ready to power your vehicle.

For EV charging in Hollister, consider this a quick stop. 350 kW peak power can add about 200 miles of range in under 20 minutes for compatible vehicles, meaning you can get back on the road or finish your shopping quickly. It's best suited for drivers who need significant range added in a short time, rather than a full overnight charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Hollister Shopping Center.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Hollister Shopping Center.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB