chargevu
1 of 1 available200 kW peakIndependent

Ionity Ionity Pudasjärvi

Sähkötie 1, Pudasjärvi, FI

1 port

Ports at this station

  • CCS2

    1× · up to 200 kW

    Available

Station info

Address
Sähkötie 1, 93100, Pudasjärvi, Finland
Coordinates
65.36058, 26.98682
Last verified
2026-08-30

About this stop

This station uses CCS (Type 2) connectors, compatible with most European EVs. It delivers up to 200 kW of peak power, classifying it as ultra-rapid charging. The operator is listed as independent or unlisted. EV charging in Pudasjärvi is served by this operational site. The station has an unstated number of charging points and is currently operational.

A 200 kW charging speed can add approximately 100 miles of range in under 20 minutes for a compatible EV. This makes the Ionity Pudasjärvi station a practical stop for longer journeys. It can also serve as a quick top-up for local drivers needing substantial charge. The station is confirmed to be operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Ionity Ionity Pudasjärvi.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Ionity Ionity Pudasjärvi.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB