chargevu
2 of 2 available22 kW peakPLN (Indonesia)

Jatinangor Golf & Resort

Jatinangor Golf & Resort, Kabupaten Sumedang, ID

2 ports · IDR 2467/kWh

Ports at this station

  • Type 2 (tethered)

    2× · up to 22 kW

    Available

Station info

Address
Jatinangor Golf & Resort, Kabupaten Sumedang, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.91188, 107.76287
Last verified
2026-05-22

About this stop

The Jatinangor Golf & Resort has one operational charging point in Kabupaten Sumedang, Indonesia. PLN manages this station, offering 22 kW peak AC charging. The single point uses a tethered Type 2 connector. This is one option for EV charging in Kabupaten Sumedang.

A 22 kW peak rate means a full charge will take several hours. This charger is better suited for a local top-up or for extended parking rather than a quick road trip stop. It provides 22 kW AC, which adds about 60-80 miles of range per hour for a typical EV, depending on the vehicle. The cost is IDR 2467 per kilowatt-hour.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Jatinangor Golf & Resort.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Jatinangor Golf & Resort.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB