chargevu
0 of 2 available50 kW peakflo

Jeff Smith’s County Chevrolet- SmartDC 50KW

224 talbot street north, Essex, CA

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
224 talbot street north, N8M 2C8, Essex, ON, Canada
Access
24 hours daily
Website
flo.com
Coordinates
42.17837, -82.82777
Last verified
2025-11-11

About this stop

This flo network station at Jeff Smith’s County Chevrolet in Essex, CA, offers CCS (Type 1) and CHAdeMO connectors. These fit most electric cars sold in North America and Japan. The station is currently operational.

A 50 kW peak rapid charger is enough to add about 100 miles of range to a typical EV in 30 minutes. This makes it a practical stop for EV charging in Essex if you need a quick boost on a longer journey. It is not intended for overnight charging. Plan for about half an hour to get a meaningful charge, depending on your car and battery temperature.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Jeff Smith’s County Chevrolet- SmartDC 50KW.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Jeff Smith’s County Chevrolet- SmartDC 50KW.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB