chargevu
0 of 1 available11 kW peakIndependent

JELD-WEN Herning

Nystedvej 2, HERNING, DK

1 port

Ports at this station

  • Type 2

    1× · up to 11 kW

    Unknown

Station info

Address
Nystedvej 2, 7400, HERNING, Midtjylland, Denmark
Total points
1
Coordinates
56.15663, 8.97776
Last verified
2024-02-20

About this stop

This is a single 11 kW AC charging point at JELD-WEN Herning, located in Herning, DK. It is operated by an independent or unlisted network. The station has one Type 2 connector, which is a socket only. This charger is best suited for drivers who need to top up their EV battery locally.

An 11 kW peak charging speed means you might add about 60 miles of range per hour, depending on your car. This makes it a slower option for EV charging in Herning, more suited for local use or longer stays rather than quick road trip stops. Plan for it to take several hours to fully recharge a depleted battery.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at JELD-WEN Herning.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of JELD-WEN Herning.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB