chargevu
3 of 3 available50 kW peakAllego BV

Kerpener Straße 175

Kerpener Straße 175, Kerpen, DE

3 ports

Ports at this station

  • CCS2

    1× · up to 50 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • Type 2 (tethered)

    1× · up to 43 kW

    Available

Station info

Address
Kerpener Straße 175, 50170, Kerpen, Germany
Coordinates
50.89867, 6.68272
Last verified
2024-07-28

About this stop

Allego BV operates this rapid EV charging station at Kerpener Straße 175 in Kerpen, Germany. It offers CCS (Type 2), CHAdeMO, and Type 2 connectors. The peak power is 50 kW.

This station is a practical stop for EV charging in Kerpen. A 50 kW peak power means it can add approximately 150 miles of range to a compatible EV in one hour, depending on the vehicle. This is suitable for quick top-ups during local driving or for drivers on longer journeys needing to replenish their battery partway through their trip.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Kerpener Straße 175.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Kerpener Straße 175.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB