chargevu
2 of 2 available50 kW peak(Business Owner at Location)

Kia / Honda Autohaus Heinen

Hermannstraße 138, Hörde, Dortmund, DE

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Available
  • CCS2

    1× · up to 20 kW

    Available

Station info

Address
Hermannstraße 138, Hörde, 44263, Dortmund, Dortmund, Germany
Access
Die Säule ist nutzbar: Mo-Fr 7:30-18:30Uhr, Sa: von 09:00 bis 16:00 Uhr , So: von 10:00 bis 16:00 Uhr
Total points
2
Coordinates
51.48663, 7.51143
Last verified
2015-11-27

About this stop

Kia Honda Autohaus Heinen in Dortmund is an independent EV charging site with two points capable of 50 kW peak charging. The station offers CCS (Type 2) and CHAdeMO connectors. It is currently operational.

This station is best suited for drivers needing a rapid charge rather than a full top-up. A 50 kW peak rate means you can add approximately 100 miles of range to many EVs in about 30 minutes, depending on the vehicle's battery and charging speed. This makes it a useful stop for EV charging in Dortmund when you need power quickly.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Kia / Honda Autohaus Heinen.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Kia / Honda Autohaus Heinen.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB