chargevu
2 of 2 available22 kW peakEnBW (D)

Klosterhof 14

Klosterhof 14, Rot an der Rot, DE

2 ports

Ports at this station

  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available
  • Schuko (CEE 7/4)

    1× · up to 22 kW

    Available

Station info

Address
Klosterhof 14, 88430, Rot an der Rot, Germany
Coordinates
48.01353, 10.03117
Last verified
2021-07-09

About this stop

The EnBW network operates this EV charging site at Klosterhof 14 in Rot An Der Rot, Germany. It provides 22 kW peak AC charging, which is slower than DC fast chargers. The connectors available are CEE 7/4, also known as Schuko or Type F, common for standard household plugs. The exact number of charging points is not specified. Current operational status is unknown and should be verified before your visit, making it important to plan your EV charging in Rot An Der Rot accordingly.

At 22 kW peak, this station is best suited for local top-ups or longer stops rather than quick road trip charging. To put 22 kW into perspective, charging an electric car with a 60 kWh battery could take around 3 hours to reach about 80% charge. This speed is comparable to what many homes can offer, so consider it for when you have ample time, like during an overnight stay or while attending an event in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Klosterhof 14.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Klosterhof 14.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB