chargevu
0 of 2 available22 kW peakIndependent

Mennekes AdS Enercoop

Tangenziale 12 Luglio 1944 km 1,130, Carpi, IT

2 ports

Ports at this station

  • Type 2

    2× · up to 22 kW

    Unknown

Station info

Address
Tangenziale 12 Luglio 1944 km 1,130, Carpi, MO, Italy
Total points
1
Coordinates
44.80622, 10.89182
Last verified
2021-07-27

About this stop

This station offers one Type 2 socket, compatible with most EVs sold in Europe. It provides 22 kW AC charging, which is slower than DC fast charging. This makes it a good option for topping up your battery while shopping or running errands locally in Carpi. Charging at 22 kW adds roughly 20-25 miles of range per hour, depending on your vehicle. It’s operated by an independent or unlisted network and is currently operational.

Plan for this station as a local charging solution rather than a quick stop on a long journey. A full charge from near empty will take several hours. The connector type is a universal Type 2 socket. EV charging in Carpi includes this independent offering. Check your car's charging speed capabilities, as most onboard chargers will default to the station's maximum output of 22 kW.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Mennekes AdS Enercoop.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Mennekes AdS Enercoop.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB