chargevu
0 of 2 available3.7 kW peakChargePoint

META MPK22-23

309 Constitution Dr, Menlo Park, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
309 Constitution Dr, 94025, Menlo Park, CA, United States
Access
24 hours daily
Coordinates
37.48171, -122.16505
Last verified
2025-11-11

About this stop

ChargePoint operates the META MPK22-23 station in Menlo Park. This site offers Level 2 AC charging. All connectors on site are Type 1 (J1772). The station is currently reported as operational. This provides EV charging in Menlo Park for local drivers.

A peak power of 4 kW is considered slower AC charging. This means it adds about 12-16 miles of range per hour of charging. This speed is best suited for topping up your battery while you are parked for a few hours, such as at work or home, rather than for quick top-ups on longer journeys. It is a practical option for drivers needing to extend their vehicle's range over a longer parking session.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at META MPK22-23.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of META MPK22-23.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB