chargevu
2 of 2 available25 kW peakJolt

North East Rd & Fosters Rd Parking Lot

North East Rd & Fosters Rd, Greenacres, AU

2 ports · Payment Required First 7kWh free, then $0.40 per kWh thereafter. $5/hr idle time

Ports at this station

  • CHAdeMO

    1× · up to 25 kW

    Available
  • CCS2

    1× · up to 25 kW

    Available

Station info

Address
North East Rd & Fosters Rd, 5086, Greenacres, SA, Australia
Total points
1
Coordinates
-34.87100, 138.63722
Last verified
2023-01-11

About this stop

This Jolt charging station at North East Rd & Fosters Rd Parking Lot in Greenacres offers 25 kW peak AC charging, best suited for drivers who need a slower AC top-up. It provides one charging point with CCS (Type 2) and CHAdeMO connectors. This is an operational site, part of the Jolt network.

For EV charging in Greenacres, consider this a local top-up spot. 25 kW peak means adding about 10 miles of range per hour, depending on your vehicle. Payment is required after the first 7 kWh, which are free. Subsequent charging costs $0.40 per kWh. Be aware of a $5 per hour idle fee if you leave your vehicle connected after charging is complete.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at North East Rd & Fosters Rd Parking Lot.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of North East Rd & Fosters Rd Parking Lot.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB