chargevu
0 of 2 available3.7 kW peakChargePoint

PALMS CONDO'S PALMS CONDO 2

2806 LOT 2 East Alluvial Avenue, Fresno, US

2 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown

Station info

Address
2806 LOT 2 East Alluvial Avenue, 93720, Fresno, CA, United States
Access
24 hours daily
Coordinates
36.84641, -119.73257
Last verified
2025-11-11

About this stop

This ChargePoint station at PALMS CONDO'S PALMS CONDO 2 in Fresno offers Type 1 (J1772) connectors. These fit most electric cars sold in North America. The station operates at a peak power of 4 kW. EV charging in Fresno includes this location, which has an unstated number of charging points. The reported status is operational.

At 4 kW peak, this station is best suited for local top-ups rather than rapid charging. Expect to add about 10 to 15 miles of range per hour of charging. This speed is comparable to a Level 2 home charger. Drivers needing a quick charge on a longer journey might find this station too slow. It is a practical option for residents or visitors needing to charge their EV while parked for an extended period.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PALMS CONDO'S PALMS CONDO 2.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PALMS CONDO'S PALMS CONDO 2.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB