chargevu
1 of 1 available7 kW peakEvergo

Parque Eólico Matafongo

Carretera San José - Sabana Buey, Villa Fundacion , DO

1 port · 127.44 + itbis / hr

Ports at this station

  • Type 1 (J1772)

    1× · up to 7 kW

    Available

Station info

Address
Carretera San José - Sabana Buey, Villa Fundacion , Peravia, Dominican Republic
Total points
1
Coordinates
18.25938, -70.49504
Last verified
2022-08-19

About this stop

Evergo operates one charging point at Parque Eólico Matafongo in Villa Fundacion, Dominican Republic. The station delivers 7 kW peak AC charging through a single Type 1 (J1772) connector. It is currently operational.

This 7 kW station is best suited for local top-ups rather than rapid road-trip charging. For context, a 7 kW charger typically adds about 25 to 30 miles of range per hour of charging, depending on the vehicle. This makes it a practical option for EV charging in Villa Fundacion for residents or those with extended stays. The cost is 127.44 Dominican Pesos plus ITBIS per hour.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Parque Eólico Matafongo.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Parque Eólico Matafongo.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB