chargevu
0 of 4 available3 kW peakChargePoint

PIE AE

Camp Mabry 1 Mile Track, Austin, US

4 ports

Ports at this station

  • NEMA 5-20R

    2× · up to 1 kW

    Unknown
  • Type 1 (J1772)

    2× · up to 3 kW

    Unknown

Station info

Address
Camp Mabry 1 Mile Track, 78703, Austin, TX, United States
Access
24 hours daily
Coordinates
30.31658, -97.75764
Last verified
2019-12-24

About this stop

This PIE AE station in Austin offers EV charging through ChargePoint. It provides NEMA 5-20R and Type 1 (J1772) connectors, compatible with most electric vehicles. Power tops out at 3 kW AC.

At 3 kW peak, this station is best suited for topping up your battery while parked locally, not for quick road trip charging. To put 3 kW into perspective, adding 10 miles of range might take around one hour. This is a practical option for EV charging in Austin when you have time to spare.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PIE AE.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PIE AE.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB