chargevu
1 of 1 available22 kW peakPLN (Indonesia)

PLN ULP Cibitung

PLN ULP Cibitung, , Jl. Raya Fatahillah No.6, Kalijaya, Kabupaten Bekasi, ID

1 port · Rp2467/kWh

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
PLN ULP Cibitung, , Jl. Raya Fatahillah No.6, Kalijaya, 17530, Kabupaten Bekasi, Jawa Barat, Indonesia
Total points
1
Coordinates
-6.26679, 107.13073
Last verified
2026-07-28

About this stop

This PLN operated station offers 22 kW peak AC charging, suitable for drivers prioritizing slower, steady power. One charging point is equipped with a tethered Type 2 connector. It provides essential EV charging in Kabupaten Bekasi for local residents and those on longer journeys needing an extended charge. The station is currently reported as operational.

A 22 kW peak charging rate means you can add about 10-15 miles of range per hour of charging, depending on your vehicle's efficiency. This makes it a practical choice for local drivers needing to top up their battery while parked for a few hours. For road trippers, consider this a slower AC stop to add significant range over a longer break, rather than a quick fast charge. The cost is Rp2467 per kilowatt-hour.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Cibitung.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Cibitung.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB